Last week I spent three hours redesigning email templates for one of our brands. New layout, better images, cleaner formatting.
Open rates went up maybe 1%. Revenue from email didn't move.
You know what would have actually moved revenue? Fixing the post-purchase flow that had been broken for two weeks. Which I knew about. And kept putting off because template redesign felt more productive.
This is the trap. And there's actually a name for it.
The one thing that matters this week
A guy named Goldratt wrote a book called "The Goal" back in the 80s about manufacturing plants . The core idea is simple: every system has ONE constraint that limits its total output. Improving anything that isn't the constraint is waste.
Not "less efficient." Waste.
Think about it like a pipe with a narrow section in the middle. You can widen the entrance all you want. You can polish the exit until it shines. Water still only flows as fast as that narrow section allows.
In ecommerce, the constraint moves around . Early on it's usually traffic. You don't have enough people seeing your store. Then you get traffic and the constraint shifts to conversion. People see your store but don't buy. Fix that and it moves to retention, or AOV, or margins, or email.
The problem is most of us keep optimizing whatever we optimized last. We got good at traffic, so we keep spending on traffic even when conversion is the real bottleneck.
How to find your constraint
Here's what I do now. Every Friday, instead of looking at everything, I ask one question: if I could only improve ONE number this week, which one would move total profit the most?
That's the constraint. Everything else waits.
Sounds obvious. It's not. Because the constraint is usually the thing you least want to work on. The boring thing. The thing that requires digging into data instead of launching a new creative.
For us last month, the constraint was shipping costs on one brand. Not exciting. But fixing it moved our margins more than any ad optimization could have.
The five steps
Goldratt's framework is five steps, and I've been using a version of it without knowing it had a name:
- Find the constraint (what's the bottleneck right now?)
- Squeeze it (get the most out of it without spending money)
- Align everything else to it (don't create more demand than the bottleneck can handle)
- Fix it for real (now invest in removing it)
- Go back to step 1 (the constraint just moved)
That's it.
I wish someone had showed me this when I was 22 and burning money on Facebook Ads while my store's conversion rate was terrible. The constraint was the store itself. More traffic just meant paying more to show people a store they didn't want to buy from.
What to do this week
Pull up your numbers. Not all of them. Just these: traffic, conversion rate, and returning customer rate.
Which one, if you doubled it, would have the biggest impact on profit?
That's your constraint. Work on that. Ignore the rest until it moves.
I'm serious. Ignore the rest. It feels wrong. Do it anyway.
- [S1] The Goal by Eliyahu Goldratt (Theory of Constraints):